Long leads NB past Ridgedale, 32-13

Luke Long scored three touchdowns on the ground and added a passing touchdown to Brody Walter as North Baltimore rolled past Ridgedale 32-13 in Northwest Central Conference play Friday night.

The Tigers (3-4, 2-4 NWCC) jumped out to a 19-0 lead in the second quarter following Trevor Walter’s fumble return for a touchdown.

The Rockets (1-6, 0-6 NWCC) scored on touchdown runs in the second and fourth quarters.

“The offensive line played with a chip on their shoulders tonight and carried us all game,” North Baltimore coach Wade Ishmael said. “Luke Long got us tough yards when we needed them and the defense played lights out tonight. It was a great team win for us on homecoming.”